D60 D65 Single and Double Flange Bulldozer Track Roller Bottom Roller

D60 D65 Single and Double Flange Bulldozer Track Roller Bottom Roller

D60 D65 single and double flange bulldozer track roller base roller 
Merchandise Info
CZPT Bulldozer Assist Roller

Doder Keep track of Roller

D85 Base Roller

Dozer bottom roller

D65 reduce roller 

Single Track roller

Duoble Monitor Roller

Specs for crawler excavator track roller

Framework

wheel entire body

35MnB/40Mn2/40MnB/50Mn

facet include

QT500-seven

shaft

45#

ring float

GLKBTCr16Mo2NiCu

O ring

rubber

Bimetal sleeve

CuPb10Sn10

Hexagon socket bolt

JB/T1000-1977

lubricating oil

forty#

The main parameters

identify

monitor roller/bottom roller/assistance roller/Reduce Roller

Part quantity

7G571

Color

Black or Yellow

Surface area Hardness

HRC48-fifty four,deepth:4mm-10mm

Method

Forging&Casting

Warranty time

2000 hour (Typical daily life 4000hours   ) 

Certification

CZPT-9002

Supply Time

Inside of thirty days right after agreement   recognized

Deal

Fumigate seaworthy packing

Software

observe roller/base roller/assist roller/Reduce Roller is applicate for Power & Mining, ground participating portion.

Relevant Items

Functions and Advantage

one)Our monitor rollers are adopting by way of hardening system and spraying quenching program even though complying with the stringent ISO System.

two)We are capable to assure the element has excellent wear resistance even in the most extreme working circumstances

three)We are making use of advance machining centre,horizontal and vertical CNC machining to execute procedures these kinds of as machining, drilling, threading and milling to make sure the qulity and precision of every single part to guarantee the precision of assembly proportions. This is to maximize the life span of each part and lessen manufacturing expense for each hour.

4).Nicely lubricated oil recycle technique

five). High hardness :HRC52-58,deepth:8mm-12mm

6). Deep hardened put on area.

7). Great bronze bushings.

8).Undercarriage elements stock photos will send just before get.

9).All parts can verify with portion number,all elements can purchase comply with element variety.

10). Safe packing to safeguard the goods, such as wooden box,by tray.

11). Small amount can acknowledge.Sample purchase also accept.

12).Lifelong after-revenue service.

13).First /OEM /Following Market place top quality and aggressive value-two.Flexible payment conditions.

fourteen).Rapid shipping time.

fifteen).Exclusive agent approved.

sixteen).Have cooperated with many importers in us for much more than ten years.

seventeen) Good steel fibrous tissue.

18) Resist abrasion and influence well.

19) Lengthy existence-expectation.

twenty) Very good quality and aggressive price.

21)We can supply CZPT merchandise with particular specifications.

22)Merchandise sizeFollow OEM strictl.

23). One-cease services.

A.Complete undercarriage elements of excavator and bulldozer are CZPT: track roller/base roller/reduce roller, entrance loafer, sprocket rim/phase group,

provider roller/prime roller, keep track of chain with footwear/track group.

B.Excavator spring assembly with OEM dimensions, bucket url/H hyperlink, hyperlink rod/I hyperlink, monitor guard.

C.Floor Participating Tools: bucket enamel, excavator buckets, reducing edge, and stop bits

D.CZPT cylinder and seal kits: EX1200, PC1250 hydraulic cylinders are also CZPT.

25). Factory immediate price tag and Rigid Quality Handle.

We have our personal factory and overseas buying and selling place of work, attach considerably significance to items high quality in the course of the generation and often verify each goods prior to delivering.

4.Advantages:

1). Quality ensure
two). CZPT assist
3). Obtain diverse components into one particular container 
four). Unobstructed communion 
five). Shipping and delivery Merchandise in time 
six). LCL is suitable
7). OEM areas quantity assistance
eight). Making according to drawings.

9). We have sophisticated technoledge and 100% tests before shipping.

10). Rapid delivery and competitive price tag.

11). The bigger quantity you buy, the far better price and more rapidly supply we can source.

twelve). We have a skilled crew to supply expert service for you.

thirteen). We can offer you used and new,OEM,great good quality produced in china elements to you.

14). The components will give excess weight,value when quotation.

15). Authentic areas stock pictures will send before get.

16).All elements can examine with part quantity,all elements can buy stick to element variety.

seventeen). Secure packing to defend the products, this kind of as wooden box, Iron sheet for our components.

18).Modest quantity can take,Sample purchase also accept.

19). 24 hrs oversea service.

twenty).One-end getting service.

Entire undercarriage elements of excavator and bulldozer are CZPT:
Track roller/bottom roller/decrease roller, entrance loafer wheel assy, sprocket rim/section team,
provider roller/best roller, observe chain with footwear/monitor team/ Observe Adjuster/ Observe Bolt&nuts

21). Give us proper model amount/device serial amount/ any figures on the parts itself. Or evaluate the parts give us dimension or drawing.

22).Planet-course Quality.

23).Factory sale right,with Affordable price.

24).We style and make all the undercarriage areas stick to original things strictly.
25) Only Large High quality Elements Supplied:
Say No to combined different top quality areas, we only have one quality manage regular on substance, creation line and QC, our goal is to supply large top quality components at competitive price, to support our buyers do long-term organization and less difficult following-sale service

Operate Approach

one) Do not oil and distort the rubber floating seal ring throughout assembling the rollers

2) A little volume of oil ought to be coated/coated on the make contact with floor although pressing the floating oil seal.

three) Soon after ending the assembling procedure,fill in 80% of clean intense-stress motor vehicle gear oil and validate no leaking 4 several hours afterwards.

four) Keep track of roller, Decrease roller,bottom roller,support roller,provider roller, loafer are mounted with lengthy daily life properly sealed Duo-cone floating ring well sealed Duo-cone floating ring seal.

Firm Details

Package deal

After-product sales Services
1) 24 several hours for right after-income provider

two) Offer you us picture of using circumstance,items,using information, then compensation following every little thing is finished in three operating days.

3) Any claim because of to the good quality of products,the payment is not a lot more than the value of the products that have high quality difficulty.

FAQ
Q1:Are you a trade or a manufacure?
    A:We are an business and trade integration enterprise, our manufacturing unit found on HangCZPT Nanan Distric.
Q2:How can I be positive the Excavator Parts will match my excavator?
    A:Give us right design variety/equipment serial quantity/ any numbers on the elements  itself.Or evaluate the components give us dimension or drawing.
Q3:How about the payment conditions for Excavator Components?
    A:We typically take T/T or L/C. other phrases also could be negotiated.
This autumn:What is your least purchase for Excavator Elements ?
    A:It relies upon on what you are getting. Usually, our least order is one 20′ full container and LCL container (less than a container load) can be suitable.
Q5:What is your supply time for Excavator Parts ?
   A:FOB HangCZPT or any Chinese port : 25-30days . If there are any areas in inventory ,our delivery time is only 7-10 days. 
Q6:What about High quality Control?
   A:We have superb tester, check out every piece to make certain the good quality is very good,and strict control to guarantee merchandise basic safety into container.

Speak to Us

D60 D65 Single and Double Flange Bulldozer Track Roller Bottom Roller